- Hydropower projects having a capacity of 100 MW or more
- Transmission lines greater than 30 Km % 200 KVA
- Railways longer than 10 Km and metro or monorail construction
- Fast track constructions longer than 50 Km
- Other projects specified by the Government of Nepal